4.55 MWH BESS
Aplus Engineering Services successfully executed the 4.5 MW BESS (Battery Energy Storage System) installation for Soorty Unit 13, completing the project in an impressive 18 days. Our scope included the installation of battery racks, transformers.

1.97 MW Solar Project + 1.84 MWH BESS Unit - 08
Aplus Engineering Services successfully executed a 1.97 MW solar power project integrated with a 1.84 MWh Battery Energy Storage System (BESS) at Soorty Denim Unit #08, a leading textile manufacturer in Karachi, Pakistan.

1.62 MW Solar Project + 840 kWh BESS – Unit - 11
Aplus Engineering Services successfully executed a 1.62 MW solar power project integrated with an 840 kWh Battery Energy Storage System (BESS) at Soorty Enterprises Limited – Unit #11 (Spinning Unit)

748KW Solar Project
Aplus Engineering Services successfully executed a 748 kW solar power project at Lucky Textile Mill (LTM-05), Nooriabad, Karachi. Our team ensured the efficient installation and commissioning of the system, providing a reliable and high-performance renewable energy solution

350KW Solar Project Extension
Aplus Engineering Services successfully completed a 350 kW solar power project extension at Gadoon Textile Mill, Nooriabad, Karachi, further enhancing the facility's renewable energy capacity.

Construction of Earth Pits Gadoon
Aplus Engineering Services successfully completed the construction of earth pits at Gadoon Textile Mill, Amazai Swabi, ensuring a reliable grounding system for the facility. This project involved the complete process, including boring work, earth pit testing, and commissioning.